DCS/PLC System
NO | Title | Term | Order |
---|---|---|---|
82 | DCS Modification & production, Delivery Purchase contract | 21.08~22.12 | HALLA Energy&Environment |
81 | PLC Logic Change and program analysis | 21.06~21.06 | KEPCO KPS Samcheonpo Office |
80 | Purchase of ZLD Total nitrogen removal facility Improvement work PLC PANEL, etc | 21.06~21.07 | KOMIPO Boryeong P.G. Site Div. |
79 | LS DCS Spare Parts | 21.05~21.09 | Egbin Power Station |
78 | Work of BPS Pump PLC Integration in Pangyo's powerhouse | 21.04~21.06 | ABB Korea |
77 | ZLD Total nitrogen removal facility Improvement work PLC, HMI Improvement & control design | 21.04~21.09 | KOMIPO Boryeong P.G. Site Div. |
76 | General Maintenance of General Maintenance | 21.02~21.12 | Hankook Seghers Co.,Ltd. |
75 | DCS Healthiness Check | 20.10~20.10 | ABB Korea |
TEL : 02.2627.5400 / FAX : 02.2627.5440
Head Office : 805 Hoseodae Venture Tower 70, Gasan digital 1-ro, Geumcheon-gu, Seoul, Korea
Factory : 1376-1,Tongjeong-ri,Seongmun-myeon, Dangjin-si, Chungcheongnam-do, Republic of Korea
Copyrightⓒ 2021 by geseng. All rights reserved.
TEL : 02.2627.5400 / FAX : 02.2627.5440
Head Office : 805 Hoseodae Venture Tower 70, Gasan digital 1-ro, Geumcheon-gu, Seoul, Korea
Factory : 1376-1,Tongjeong-ri,Seongmun-myeon, Dangjin-si, Chungcheongnam-do, Republic of Korea
Copyrightⓒ 2022 by geseng. All rights reserved.